» ZED,CEE,SIGMA PURLINS

Z PURLINS

 
 
CEE PURLINS



Click Here For Specification
 
 
Factory Based Technology brings the following COST ECONOMIES to building system consumers :

Reasonable Initial Cost - Individual building components for the complete system arrive at the job site ready for immediate assembly and erection.

Faster Occupancy - A building systems project generally can be completed in one-third less time than other types of construction.

Cost Predictability - Since the building system unit price can be quickly and precisely calculated, the local builder / contractor can add-on site labium and other construction costs and quickly provide customer with firm project cost figures.

Low Energy Costs - A properly insulated building system can provide high thermal efficiencies. Insulation is available with and can be ordered with the building. We can use insulated panels for cladding and roofs.

Economical Maintenance - Metal will not deteriorate because of cracking, damp rot or insect damage. High Quality Silicon polyester, fluoropolymers and other coatings resist cracking, peeling chalking and fading.

Flexibility - Typically, a building system can be designed for future expansion which is achieved by removing and or side wall covers, erecting additional framework and adding matching roof and wallcovers.

Tailor made solutions and solutions with personal touch


The other advantage of dealing with us is that you personally don't have to worry about all minute aspects of construction. Your worries are ours and your tensions are ours. The procedure streamlined by us and the flow chart of events will be as follows:

» You as a customer will call us and explain us with details of land you have. If you have appionted architect and Consultant, then our team will contact them and work in an association.

» Necessary drawings will be made.Analysis of sheds designed will be done on Special American packages installed at our end.Detailing is done and bill of material is worked out.Necessary quotations and papers of commercial terms are Submitted to you.

» The civil work is carried out by our authorized local contractor or even your contractor can be utilised.

» The Erection contractor will start the work of structures and will finish the installation part within specified time decided by us.

» Necessary finishing work will be done to give the outstanding edge of your building.

» Our Design team will visit your site and will take necessary measurements.

» Once quotations and papers of commercial terms are approved and work order is released, we start the work at our factory.

» The Pre-Fabricated structures,roofing sheets and wall claddings sheets, internal False ceiling framework and boards, along with the accessories is transported to your site.

» The roofing and wall cladding work along with the false ceiling(if required) work will be done by contractor within no time.

» Your building is ready for use.
   